PROGRESS ON 13TH AT MALL

Construction crews this month removed the deck of the 13th Street bridge between Farnam and Douglas Streets as part of remaking the Gene Leahy Mall. The bridge will no longer be needed because the mall's lagoon has been filled in and the park will be at street level. The 13th Street connection across the park will be rebuilt as a regular street and reopen before this year's College World Series, which starts June 13, the Metropolitan Convention and Entertainment Authority says.

Commenting is limited to Omaha World-Herald subscribers. To sign up, click here.

If you're already a subscriber and need to activate your access or log in, click here.

Load comments

You must be a full digital subscriber to read this article You must be a digital subscriber to view this article.

Your sports-only digital subscription does not include access to this section.

Upgrade to full digital for only $3 extra per month. If you need assistance, call us at (844) 466-1452 or e-mail owhdigital@ggl.bhmginc.com.

To start a new subscription or to add digital access to your print subscription, click Sign Up to join Subscriber Plus.

If you’re already a digital subscriber, Log In.

If you need other assistance, call (844) 466-1452 or email owhdigital@ggl.bhmginc.com.

Learn more about Subscriber Plus.